Barham United Welldrillers was comissioned to construct a water bore for the purpose of dust supression during the construction of the Kelvin Grove Village in Palmerston North.
The bore will eventually provide irrigation for the village grounds.
Bore Information
114mm diameter
122m Total Depth
Casing depth 115.8m
Screen assembly 114-123m
SWL +6.8
Bore Yield +17.5 Lps